Project Information

Project Name:

Four Seasons Clubhouse

Location:

Jackson Twp. | New Jersey

Job Type:

Stucco and Stone Veneer Replacement

Description:

  • Removal of existing stucco and stone and veneer, approximately 10,400 square feet.
  • Installation of weather-resistant barrier and Vycor window and door flashings.
  • Installation of Keene Drainage Mats.
  • Installation of StoPowerwall Stucco System.
  • Installation of Owens Corning Cultured Stone.
  • Installation of  Foundation Water Proofing with Grace Bituthane Membrane.
  • Replacement of the existing roofing material with GAF Roof System with Timberline HD Lifetime shingles.
  • Sto and Owens Corning Material Warranties, GAF Golden Pledge Warranty.
Home
/
Projects
/
Four Seasons